In Brampton, the creation of second units within residential dwellings offers an affordable housing option for many residents. However, it is imperative that these units are legally registered and adhere to safety and building standards set by the city. This guide aims to provide a detailed walkthrough of the processes involved in registering a two-unit dwelling and obtaining the necessary building permits in Brampton.
Understanding Second Units:
A second unit is a self-contained residential space located within a house, potentially in the basement or any other part of the dwelling. These units contribute significantly to affordable housing solutions in Brampton. However, it’s crucial to note that a second unit is considered illegal unless registered with the city and has undergone the necessary inspections, ensuring safety, legality, and habitability.
Zoning Compliance and Pre-application Review:
Before delving into the application process, it’s essential to understand zoning regulations. Second units are permitted in detached, semi-detached, and townhouse dwellings, subject to specific zoning conditions. These units must comply with various requirements, including limitations on the number of units, parking considerations, and size constraints.
Application Process Overview:
The application process for Two-Unit Dwelling Registration and Building Permits is streamlined into a single application stream. Here’s an overview:
1.Pre-application Review and Zoning Compliance Verification:
- Second units must comply with zoning requirements to be legal.
- Conditions include limitations on the number of units, parking regulations, and size constraints.
2.Application for a Permit:
- Building permit applications are submitted online at www.brampton.ca/building.
- Application forms include:
- Application for a Permit to Construct or Demolish.
- Schedule 1 Designer Form (if someone other than an Architect or Licensed Professional Engineer is responsible for the design).
- Applicable Law Checklist.
- Water Pipe Size Plumbing Data Sheet – Two-Unit Dwellings.
3.Construction Drawings:
- Legal survey inclusion is mandatory.
- Drawings must cover various aspects, including existing and proposed floor layouts, elevations, sections, and construction details.
- Every page must include project address and designer information.
4.Registration Permit Fees:
- At submission, registration payment of $200.00 is required.
- Permit fee due is $1082.43.
Building Permit Issuance and Construction:
1.Issuance of Permit:
- The permit is issued upon approval, and outstanding fees must be paid.
- Upgrading of water service might be necessary; contact the Region of Peel for details.
Construction Requirements:
- Construction must align with approved permit drawings.
- Drawings and documents must be available on-site during inspections.
Inspection Requirements:
1.Inspection Booking:
- Arrange inspections online for various stages of construction.
- Inspection types may include underground plumbing, framing, insulation, HVAC rough-in, and more.
2.Occupancy Permit:
- Following successful inspections, an occupancy permit for the second unit is issued.
3.Compliance and Unpermitted Work:
- Construction must comply with the Building Code Act.
- Unpermitted work may require uncovering for inspection.
In Conclusion, Navigating the process of registering a two-unit dwelling and obtaining building permits in Brampton requires adherence to zoning regulations, thorough documentation, and compliance with safety standards. We at IRVI designs guides you though all steps to simplify these processes, ensuring that second units contribute positively to the community by providing legal, safe, and affordable housing options.